You are here: Home News Office News Digital Detox - a contempoary office in Brixton

Digital Detox - a contempoary office in Brixton

Digital Detox office refurbishment in Brixton London. Article on results after fit out. Office Contractors in London, Office adaptation, Office repairs, Office alterations.

Located in Brixton on the top floor of Blue Star House with stunning views over the city.  This building was a 1960s building with concrete Frame and Crittal style metal windows.  This type of building is often overlooked by clients who naturally seek out more modern buildings, as they believe they can achieve better finishes.

C and S Ltd came in and gutted the existing finishes and fixtures introducing new modern and contemporary finishes to suit the client's budget.  This work included installing a shower room, a T point and new meeting rooms.  The meeting rooms were floor to ceiling glass petitions with glass doors.  The glass partitions had a bespoke frosted manifestation applied based upon the client's own design.

The kitchen and all of the new plumbing were installed by C and S Ltd, the kitchen came from How London's and was based around the client's own requirements rather than just an off-the-shelf solution.  This enabled the client to pick and choose finishes, fixtures, tiles and everything that surrounded the T point.

As part of the works undertaken by C and S Ltd we installed a shower room. This work meant that all new drainage passed through other client’s floors and had to be carefully coordinated with existing services.

The flooring throughout the entire floor was uplifted and disposed of.  In its place we carefully prepared the existing sub floor and laid a Karndean plank to the entire main area.  Within the offices, C and S supplied and fitted carpet tiles to complement the colour scheme that the client had chosen.

The existing lighting power and data were stripped back, relocated as required in the new locations.  The existing lighting, including all emergency lighting, underwent a re-lamping exercise to ensure that, not only did the lights work and give off a uniform colour, but they also complied with current legislation.

The client chose quite a bold colour scheme for the 10th floor of Blue Star house, choosing stark white ceilings and down pipe grey on most of the walls.

Although the clients decided on the look and feel themselves and came up with the colour schemes for the project, C and S Ltd took care of all other aspects, not just the fit out, but also the licence to alter pack for the landlord approval process.  This included creating from new drawings with elevations and finishes noted on them.  The client's budget was a careful balance between what was needed and what was wanted and all along C and S Ltd offered options and opportunities to ensure that the client achieved what they wanted.  Not only did we complete on time, but we also came in slightly under the budget set by digital detox.  The entire program of works took just under four weeks to complete.  The entire package of works were completed snag free.

Digital detox moved in, in December 2015 and images can be found on social media of their new offices.

C and S Ltd proved once again that they can work together with clients as a true partnership, adapting our task as we work to ensure that the clients best interest is always at the forefront of our minds. For refit and refurbishment of office space in London, there really is no other company to call – It’s C and S Ltd all the way!

T Point in London office Flooring in London refurbishment Office partitioning in London fit ou Flooring in London office fit out London office fit out in Brixton

Office fit out in London Brixton Fit out in Office in London by C and S Ltd Refurbished Digital Detox Meeting Room in London Office refurbishment project in London

Office contractors in London

Office Contractors: Dental Contractors: Retail Contractors: Healthcare Contractors: Restaurant Contractors: School Contractors.