Client: The Fine Burger Company

Project Name: Restaurant Fit - out

Industry: Retail

Location: O2 Centre, Finchley Road, London

Completion Date: January 2006

Value: £140K

Conversion of restaurant including strip out and refit to reflect strong brand identity of “high quality burgers served in a groovy environment”.

 

Installation included:
Unique timber counters
Bespoke stainless steel kitchen
Black American Walnut flooring (restaurant area)
Safety vinyl (kitchen)
Ceramic tiles (toilet areas)
Installation of feature hanging-globe lighting
All restaurant seating & tables

 

We completed the refurbishment in 1 month with challenging limited access to site and were required to work flexibly, out of hours and over the Christmas period to ensure the January opening date was achieved. Our dedication and personal service successfully transformed a concrete box-shell to uniquely branded restaurant.




right-click and "save target as" for PDF version.

 


Client: South London & Maudsley NHS Trust

Project Name: Mapother House Day Nursery

Industry: NHS

Location: Maudsley Hospital, Denmark Hill, London SE5

Completion Date: March 2005

Value: £240K

 

Conversion of old derelict theatres and administration offices into a
bright, vibrant and safe area for children.

 

Installation included:
Structural alterations within the building
Child-friendly WCs and cubicles
Multi-coloured flooring scheme comprising many different carpets and vinyl floor

   coverings
CCTV and door entry systems
Stainless steel food preparation areas
Redirection and upgrading of all services

Installation of comfort cooling throughout

Skirtings, doors, linings all from our own joinery shop

 

Despite many hidden problems within these occupied premises, we worked in and out of hours to adhere to the programme and completed on time and within budget. Quality of finishes was controlled from production with many products being manufactured in-house. Twelve months after completion and we revisited the site with the client to achieve defects sign off and only needed to change one ceiling tile.





right-click and "save target as" for PDF version.

 

 


Client: South London & Maudsley Mental Health Trust

Project Name: Maudsley Hospital Refurbishment

Industry: NHS

Location: London

Completion Date: March 2006

Value: £300K

 

Refurbishment of 17 bathrooms in high-security section home.

 

Installation included:
Prison issue sanitary ware with electronic controls
Non-slip, capped and coved flooring, laid to falls for wet-room
Corian© lined wall-cladding for hygienic, antibacterial protection and resiliance
Anti-tamper ceilings
Electronic calling system
Anti-vandal, anti ligature, Margard windows for durability and security

 

Our policy for hands-on project management ensured that we operated with exceptional care in a challenging environment. As a result, whilst wards were fully occupied, we managed to control and maintain access to and from site with materials and labour without incident throughout the refurbishment. Furthermore, our outstanding performance enabled us to successfully complete the project 6 weeks ahead of schedule.





right-click and "save target as" for PDF version.

 

 

 

Client: Brook Street

Project Name: Refurbishments

Industry: Commercial

Locations: Cannon Street, London, Chelmsford, Colchester, Harlow
Haywards Heath, High Wycombe, Hounslow, Maidstone, Putney, London, Salisbury, Stevenage & Worcester

Completion Date: March 2003 to date

Value: £20 - £45K

 

Strip and refit standard corporate branded commercial business accommodation in 12 different high street locations.

 

Installation included:
Removal of previous tenant fixtures & fittings
Electrical data infrastructure & cabling
Plumbing
Suspended ceilings & partitioning
Decoration
Floor coverings
Light fittings

We created 12 Brook Street office refurbishments across south and central UK whilst complying with strictly defined interior specification. Our attention to detail and versatile approach ensured that each office environment was replicated with the highly recognisable brand identity, be it a modern box shell or period building location. With critical timescales of 1 month for the works, we fulfilled our guarantee of quality project management on time and to budget by successfully completing each refit in a three week period.


right-click and "save target as" for PDF version.



Client: Hi-Life

Project Name: Health Club Refurbishment

Industry: Leisure

Location: Leighton Buzzard, Ipswich

Completion Date: 2002

Value: £15K - £200K

 

Initially commissioned to build bespoke multi-purpose reception counters, we successfully developed the client relationship to be contracted for gym refurbishments.

 

Installation included:
Bespoke reception counter
Decoration
Floor Coverings
Ceilings
Lighting
Partitioning

We successfully developed and installed bespoke reception counters, which were intricate structures with a unique design. Combining multiple materials, including a stainless steel wave, granite worktop and integrated refrigeration cabinet, these counters were a triumph in impactful branding coupled with functional design which enabled limited resource to multi-task within a defined area.

 

Our refurbishments also reflected the bold branding including deployment of a specially created “Hi-Life Blue”. We ensured quality of decoration by applying additional coats of paint in order to achieve and maintain the specified shades of colour.

As clubs were operational during refits, special care was needed and our dedication to health and safety ensured that clients were protected from the works.

An aggressive marketing strategy for newly re-branded clubs with associated local PR required strict adherence to deadlines which was achieved by our hands-on, flexible project management.


right-click and "save target as" for PDF version.

 

 

Client: Ezetienne Ozakis

Project Name: Refurbishments

Industry: Commercial

Locations: Westbourne Grove, London

Completion Date: August 2004

Value: £280K

 

Strange shapes, unusual angles and one-off finishes sum up this project.
Starting from a bare shell we created a unique retail environment.

 

Installation included:
Bespoke joinery, counters and cupboards
Bespoke leatherwork
Inlaid marmoleum flooring designs
Terrazo flooring
Leather flooring
Decorative venetian plaster panels
Air conditioning throughout

New services throughout

Lowered rafted ceilings
Unique decorative finishes

This West London site challenged us from day one with limited access,
limited storage, restricted working hours, however once again our personal,
hands-on approach to management brought the many pieces of this puzzle to a
successful completion for everyone.

This was a true one-off where uncompromising design and patience all came together.




right-click and "save target as" for PDF version.

interior
email uscontact us
contact us