Construction solutions - Case Studies
Construction practice & Refurbishment
CASE
STUDIES
Client: The
Fine Burger Company
Project
Name: Restaurant Fit - out
Industry: Retail
Location: O2 Centre, Finchley Road, London
Completion
Date: January 2006
Value: £140K
Conversion
of restaurant including strip out and refit to reflect
strong brand identity of “high quality burgers
served in a groovy environment”.
Installation
included:
Unique
timber counters
Bespoke
stainless steel kitchen
Black
American Walnut flooring (restaurant area)
Safety
vinyl (kitchen)
Ceramic
tiles (toilet areas)
Installation
of feature hanging-globe lighting
All
restaurant seating & tables
We
completed the refurbishment in 1 month with challenging limited access to site and were required to work flexibly,
out of hours and over the Christmas period to ensure the January opening date was achieved. Our dedication
and personal service successfully transformed a concrete box-shell to uniquely branded restaurant.
right-click
and "save target as" for PDF version.

Client: South
London & Maudsley NHS Trust
Project
Name: Mapother
House Day Nursery
Industry: NHS
Location: Maudsley
Hospital, Denmark Hill, London SE5
Completion
Date: March
2005
Value: £240K
Conversion
of old derelict theatres and administration offices into
a
bright, vibrant and safe area for children.
Installation
included:
Structural
alterations within the building
Child-friendly
WCs and cubicles
Multi-coloured
flooring scheme comprising many different carpets and
vinyl floor
coverings
CCTV
and door entry systems
Stainless
steel food preparation areas
Redirection
and upgrading of all services
Installation
of comfort cooling throughout
Skirtings,
doors, linings all from our own joinery shop
Despite
many hidden problems within these occupied premises,
we worked in and out of hours to
adhere to the programme and completed on time and within budget.
Quality of finishes was controlled from production with
many products being manufactured
in-house. Twelve months after completion and we revisited
the site with the client to achieve defects sign off
and only needed to change one ceiling tile.
right-click
and "save target as" for PDF version.

Client: South
London & Maudsley Mental Health Trust
Project
Name: Maudsley
Hospital Refurbishment
Industry: NHS
Location: London
Completion
Date: March
2006
Value: £300K
Refurbishment
of 17 bathrooms in high-security section home.
Installation
included:
Prison
issue sanitary ware with electronic controls
Non-slip,
capped and coved flooring, laid to falls for wet-room
Corian© lined
wall-cladding for hygienic, antibacterial protection
and resiliance
Anti-tamper
ceilings
Electronic
calling system
Anti-vandal,
anti ligature, Margard windows for durability
and security
Our
policy for hands-on project management ensured that we
operated with exceptional care in a challenging environment.
As a result, whilst wards were fully occupied, we managed
to control and maintain access to and from site with
materials and labour without incident throughout the
refurbishment. Furthermore, our outstanding performance
enabled us to successfully complete the project 6 weeks
ahead of schedule.
right-click
and "save target as" for PDF version.

Client: Brook
Street
Project
Name: Refurbishments
Industry: Commercial
Locations: Cannon Street, London, Chelmsford, Colchester, Harlow
Haywards Heath, High Wycombe, Hounslow, Maidstone, Putney,
London, Salisbury, Stevenage & Worcester
Completion
Date: March 2003 to date
Value: £20
- £45K
Strip
and refit standard corporate branded commercial business
accommodation in 12 different high street locations.
Installation
included:
Removal
of previous tenant fixtures & fittings
Electrical
data infrastructure & cabling
Plumbing
Suspended
ceilings & partitioning
Decoration
Floor
coverings
Light
fittings
We
created 12 Brook Street office refurbishments across
south and central UK whilst complying with strictly defined
interior specification. Our attention to detail and versatile
approach ensured that each office environment was replicated
with the highly recognisable brand identity, be it a
modern box shell or period building location. With critical
timescales of 1 month for the works, we fulfilled our
guarantee of quality project management on time and to
budget by successfully completing each refit in a three
week period.
right-click
and "save target as" for PDF version.

Client: Hi-Life
Project
Name: Health
Club Refurbishment
Industry: Leisure
Location: Leighton Buzzard, Ipswich
Completion
Date: 2002
Value: £15K
- £200K
Initially
commissioned to build bespoke multi-purpose reception
counters, we successfully developed the client relationship
to be contracted for gym refurbishments.
Installation
included:
Bespoke
reception counter
Decoration
Floor
Coverings
Ceilings
Lighting
Partitioning
We
successfully developed and installed bespoke reception
counters, which were intricate structures with a unique
design. Combining multiple materials, including a stainless
steel wave, granite worktop and integrated refrigeration
cabinet, these counters were a triumph in impactful branding
coupled with functional design which enabled limited
resource to multi-task within a defined area.
Our
refurbishments also reflected the bold branding including
deployment of a specially created “Hi-Life Blue”.
We ensured quality of decoration by applying additional
coats of paint in order to achieve and maintain the specified
shades of colour.
As
clubs were operational during refits, special care was
needed and our dedication to health and safety ensured
that clients were protected from the works.
An aggressive marketing strategy for newly re-branded clubs with associated
local PR required strict adherence to deadlines which was achieved by our
hands-on, flexible project management.
right-click
and "save target as" for PDF version.

Client: Ezetienne
Ozakis
Project
Name: Refurbishments
Industry: Commercial
Locations: Westbourne
Grove, London
Completion
Date: August
2004
Value: £280K
Strange
shapes, unusual angles and one-off finishes sum up this
project.
Starting from a bare shell we created a unique retail environment.
Installation
included:
Bespoke
joinery, counters and cupboards
Bespoke
leatherwork
Inlaid
marmoleum flooring designs
Terrazo
flooring
Leather
flooring
Decorative
venetian plaster panels
Air
conditioning throughout
New
services throughout
Lowered
rafted ceilings
Unique
decorative finishes
This
West London site challenged us from day one with limited
access,
limited storage, restricted working hours, however once
again our personal,
hands-on approach to management brought the many pieces
of this puzzle to a
successful completion for everyone.
This was a true one-off where uncompromising design and
patience all came together.